Texin Steel global project achievements – from rapid deployment to permanent buildings
A 45‑meter single‑lane Bailey bridge was supplied to a remote region of Uzbekistan and installed in just 7 days, ensuring post‑disaster logistics. The bridge is hot‑dip galvanized, designed for Highway‑Ⅰ loading and capable of carrying heavy trucks.
The local government commented: “This bridge not only solved our urgent need but also provides a safe passage for the ongoing reconstruction efforts.”
500 foldable container houses were rapidly deployed to provide temporary shelter for earthquake victims. All units were manufactured and delivered within two weeks, and installed on site in just three days, complete with water and electrical connections.
The UN Office for the Coordination of Humanitarian Affairs (OCHA) praised Texin Steel as “a model of disaster response”.
Texin supplied 30 units of 110kV transmission towers to expand the rural electricity grid, improving power reliability. All towers are designed according to IEC standards, hot‑dip galvanized, and suitable for tropical climates.
The Kenya Power Company stated: “Texin's products are of excellent quality and delivered on time – a reliable partner.”
Total floor area of 12,000㎡, including crane runways. From design to delivery took only 60 days. The steel frame uses Q355B material, seismic grade 8, and fire‑resistant coating complying with local regulations.
The workshop has already been put into operation for heavy machinery manufacturing, and the client is highly satisfied with the construction precision and schedule.