Uzbekistan Bailey Bridge Project

Uzbekistan · 2025
Uzbekistan Bailey Bridge main image

A 45‑meter single‑lane Bailey bridge was supplied to a remote region of Uzbekistan and installed in just 7 days, ensuring post‑disaster logistics. The bridge is hot‑dip galvanized, designed for Highway‑Ⅰ loading and capable of carrying heavy trucks.

The local government commented: “This bridge not only solved our urgent need but also provides a safe passage for the ongoing reconstruction efforts.”

Installation site Bridge opening
← Back to Projects List

Turkey Post‑Earthquake Temporary Housing

Turkey · Kahramanmaraş · 2024
Turkey earthquake housing main image

500 foldable container houses were rapidly deployed to provide temporary shelter for earthquake victims. All units were manufactured and delivered within two weeks, and installed on site in just three days, complete with water and electrical connections.

The UN Office for the Coordination of Humanitarian Affairs (OCHA) praised Texin Steel as “a model of disaster response”.

Relief camp overview Interior of container house
← Back to Projects List

Kenya Power Transmission Tower Upgrade

Kenya · 2025
Kenya power tower main image

Texin supplied 30 units of 110kV transmission towers to expand the rural electricity grid, improving power reliability. All towers are designed according to IEC standards, hot‑dip galvanized, and suitable for tropical climates.

The Kenya Power Company stated: “Texin's products are of excellent quality and delivered on time – a reliable partner.”

Tower erection Transmission line
← Back to Projects List

Vietnam Haiphong Steel Workshop

Vietnam · Haiphong · 2025
Vietnam steel workshop main image

Total floor area of 12,000㎡, including crane runways. From design to delivery took only 60 days. The steel frame uses Q355B material, seismic grade 8, and fire‑resistant coating complying with local regulations.

The workshop has already been put into operation for heavy machinery manufacturing, and the client is highly satisfied with the construction precision and schedule.

Interior of workshop Crane runway
← Back to Projects List