Quality Control & Certifications Standards We Work To, Tests We Actually Run

A chimney cannot be inspected after it is erected. The control points below are where we hold quality, and where third-party inspectors join.

A chimney cannot be inspected after it is erected. Everything that matters has to be verified in the workshop — which is why the control points below matter more than the certificates on the wall.

ISO 9001:2015 AWS D1.1 GB/T 50051-2021 ISO 12944 SGS · BV · TÜV
ScopeStandardHow we apply it
Quality managementISO 9001:2015Documented procedures, ITP per order, traceability from plate to piece mark
Chimney designGB/T 50051-2021Structural calculation and detail drawings, including wind and seismic loading
High-rising structuresGB 50135-2019Towers, masts and chimneys — where the client's specification requires Eurocode
WeldingAWS D1.1WPS/PQR for every joint type; welders qualified and tested by an independent body
Non-destructive testingUT / RT / MT / PTPer contract acceptance level, with third-party witness available at any hold point
Corrosion protectionISO 12944C3 to C5-M systems, DFT recorded coat by coat
European codeGB/T 50051-2021 / GB 50135-2019Applied where the client specifies European design code
Control Points

Where Quality Is Actually Held

01

Material

Mill certificate against drawing, plate identification, thickness and impact test verified.

02

Forming

Circularity by template, peaking measured, course marking carried through.

03

Welding

WPS compliance, welder ID per joint, visual 100 %, NDT to contract level.

04

Coating

Sa 2.5, soluble salt test, DFT per coat, records archived with the order.

Ultrasonic testing of a chimney shell weld
Ultrasonic testing before the coating stage, not after.

NDT: what we actually run

NDT percentages are usually set by the contract. Where the contract is silent, these are the defaults we propose — deliberately higher than the local norm on the critical seams.

  • Longitudinal seams — 100 % UT on the first 10 m from the base, 20 % above
  • Circular seams — 20 % UT per course, with the sample rotating between courses
  • T-joints and cross seams — 100 % RT where specified
  • Attachment welds — 100 % visual, 10 % MT
  • Repairs — 100 % re-tested, with the repair located on the record drawing

If your engineer requires a different scheme, we will follow it. The point is to agree it in writing before fabrication, not argue about it after.

Third Party

Independent Inspection

We are regularly inspected by SGS, Bureau Veritas and TÜV, both for individual orders and for buyer-driven audits. We do not treat it as an interruption.

  • What they witness — material identification, weld fit-up, NDT, coating DFT, trial assembly, packing
  • When to tell us — at order stage, so the hold points can be aligned with the inspector's itinerary
  • Cost — third-party fees are normally for the buyer's account; we quote them separately and transparently
  • Documents — signed inspection releases and reports are included in the shipment documents

Certificates we hold

  • ISO 9001:2015 — quality management system, certified by a recognised body
  • Welder qualification — to AWS D1.1 and to GB/NB standards for the positions used
  • WPS/PQR library — covering SAW, FCAW, GMAW and SMAW on Q235, Q355 and stainless grades
  • NDT personnel — Level II certificates for UT, RT, MT and PT
  • Export registration — full export licence and customs registration; we ship FOB, CIF and CFR

Scanned copies of the current certificates are provided with any quotation on request.

Warranty

What We Put in Writing

Warranty terms that stay vague are worth nothing. These are the terms we normally offer, and we will put them in the contract.

  • Fabrication defects — 24 months from delivery, covering workmanship and welding
  • External coating — 5 years against blistering, peeling or rust-through when applied to our specified system
  • Lining — system-specific, normally 5 years for glass flake and coatings, longer for stainless liners
  • Design — design responsibility accepted in writing where we carry out the structural calculation
  • Exclusions — stated explicitly: operating outside the agreed gas condition, site damage, third-party erection errors
Coated chimney sections ready for shipment
Coated, marked and inspected before packing.
Next Step

Send Your Chimney Spec —
Response Within 24 Hours

Our engineers review every enquiry personally. Attach a drawing or just describe the plant — we will come back with a technical proposal and a priced offer.

  • Drawings or applicable standard
  • Quantity / number of stacks
  • Destination port
  • Flue gas condition
  • Required delivery date
  • Payment terms